Monday, July 27, 2009

back porch continuing...

 
Finally got all the A frames put up last week. Then we decided to use up a couple of spare (new, but unused) windows we have had around the place for a while to make roof lights. We took them out from their outer frame, and removed the bottom strip of wood to allow them to drain off properly.They fit pretty much exactly between two of the A frames.
Need to use zinc sheets now to seal round top & sides, and to drain them off the bottom. Will do this next, as we fit more woodwork to hold the slates. Very pleased with these, as it will give lots more light than we had originally planned.
So its beginning to take shape well now. Once we have bought the zinc to make the gutters and the weather stays dry for a few days we can take off the slates from the roof behind and tie-in the new roof gable. The front gable end is also going to be glazed - we discovered that it was possible to get triangular DGUs, so thats why the front gable doesn't have an A frame. We have put in the inside walls, using mainly beton cellulaire blocks. The front two gaps will have terracotta blocks, as they ran out of the others, and we had these spare in the hangar. The outside will be a skin of stone to match the house.
 
The floor will be slated with what is left of the  slate slabs we have found all over the garden, and which we believe were the original floor of the house. This is a preliminary layout...  Gertie obviously approves.

No comments: