We decided a few years ago that it would make a really good workshop. We had strengthened the roof trusses and made it waterproof a few years back (before the roof collapsed completely) and put in a couple of small skylight windows last year.
- but apart from that we only got round to doing more this year, starting with a massive clear-out.
Pete spent weeks laying a concrete floor, a couple of square meters at a time. This really pissed the moggies off, as they had been using the nice soft earth floor as a toilet. There were a couple of "offerings" on the last square of concrete to be laid, but then they got the message and went elsewhere.
Which is more than can be said for the swallows, who crapped all over the place this year -
including on the newly-whitewashed cross-beam which happened to be under their second nest of the year. That lot have finally fledged, and next year they will have to look elsewhere for real-estate.
These pictures show the state of the place until recently. The freezers are on what was the only bit of concrete floor, and in the back corner is my collection of scrap metal, mainly saved from the garden and other outbuildings since we got the place.
We have gradually rendered the inside walls (using lime mortar) to the height of the side walls, and then whitewashed these, using lime. The planks are for hanging shelves/tools from, as the stonework is a nightmare to fix stuff onto, one it's rendered. I am just whitewashing straight onto the gable walls above the rendering, as there are fewer holes in the upper walls.
So the place is starting to look like it may one day be a nice place in which to work.
We have opened up the two holes in the wall at the top of the back gable, and these give a surprising amount of extra light (just visible behind the strip lights). I have glazed these, while leaving a bit of an air gap for ventilation (but will have to make it swallow-proof).
We have opened up the two holes in the wall at the top of the back gable, and these give a surprising amount of extra light (just visible behind the strip lights). I have glazed these, while leaving a bit of an air gap for ventilation (but will have to make it swallow-proof).
All the other holes in the wall are blocked off, as they are either at roof-height for the lean-to at the back, or would open into the potting-shed lean-to.
So this leaves the doors. Back in 2005 we were given a set of old shower doors, made with toughened glass. These eventually came in useful here. The gap in the middle will be filled with a third door, hinged onto the right-hand door and able to be folded back 180 degrees. (we are waiting for hinges for this to be delivered). Quick lick of garden-paint brings them up a treat!
this is Pete just finishing fitting the top filler bar over the doors - needs painting to blend it in.
Things still to do: Finish the rendering, finish the wiring, insulate and board-out the roof, finish the doors, fit a small woodburing stove, build a workbench...
More photos to follow!
4 comments:
Post a Comment